Soil Remediation – 2

Former Service Station and Bulk Hydrocarbon Storage Site – Bellevue WA

Following demolition of site infrastructure Gemec undertook soil remediation works on the 4700 square metre site.  The remediation work involved the excavation of 9100 cubic metres of contaminateded soil.  A substantial portion (~50%) of the soil was successfully bioremediated on-site, with the remainder of contaminated soil transported to our solid waste facility north of Perth for successful bioremediation.

Stages of the Project

1. Site prior to demolition.

2. Excavation of contaminated soil.

3. Excavation of contaminated soil.

4. On-site soil bioremediation.