40, 000 L Crude Oil Contaminated Soil Remediation Project – November 2010 to May 2011.
Stages of the Project
1. Crude oil contaminated stockpile prior to remediation.
2. Equipment container, 2 x 30,000 L water storage tanks and removable irrigation system.
3. Remediated soil.
4. Soil TPH concentration graph – November 2010 through to May 2011. Soil remediated to below the Western Australian guidelines for the protection of the environment and human health in an commercial / industrial site setting.